Brian Post
This is a very intensive switching layout with a mainline and branch line. Trains are run using switch lists from JMRI and using phones as throttles (Digitrax throttles can be used). Four yards will handle switching by 6 axle diesels while 4 axle diesels handle switching to all of the industries.
Scale: HO
Era / Locale: June of 2000
Size: 40X25
Percent Benchwork Complete: 100%
Percent Track Complete: 100%
Percent Scenery Complete: 80%
Pets: Yes, one dog (Gordon). e likes his back scratched.
Parking Instructions: Park in the front. It's the only green house. Go to the side door, not the front. Do not ring the bell or knock. Just come in the side door and go downstairs.
Stairs: Yes
Scale: HO
Era / Locale: June of 2000
Size: 40X25
Percent Benchwork Complete: 100%
Percent Track Complete: 100%
Percent Scenery Complete: 80%
Pets: Yes, one dog (Gordon). He likes his back scratched.
Parking Instructions: Park in the front. It's the only green house. Go to the side door, not the front. Do not ring the bell or knock. Just come in the side door and go downstairs.
Stairs: Yes






